Project Description

While working at another engineering firm, Chad Coleman was the Project Engineer for design of major modifications to an existing water pump station, which was built as a hydro-pneumatic pump station with a maximum capacity of 2,000-gpm. Following the completion of construction the final pump station served a new ground level storage reservoir and had a capacity of 4,000-gpm. Design included provisions for improving the sound attenuation and site aesthetics for an existing 180 kW generator.